Road Improvements
Electric
Water
Wastewater
Reclaimed Water
Fiber
Natural Gas
Withlacoochee River Electric Co-Op
Distribution Line: 25kV or 14,400 Volts Per Phase Transmission Line: 115kV
Existing: >2.5 MW
Future: 50 MW (Delivering 2Q25)
Pasco County Utilities
Existing: 8", 12" and 16" Lines
Future: 16" Line (Delivering 4Q26)
Pasco County Utilities
Existing: 6", 8" and 12" Lines
Future: 12" Line (Delivering 4Q26)
Pasco County Utilities
Existing: 8" and 12" Lines
Future: Delivering 4Q26
Spectrum
Existing: 100 Gbps
Future: 100 Gbps (Available to pad in 6-8 months)
TECO Peoples Gas
6" Trunk Line
Available to pad in 6 months