Electric:
12.47kV 3-phase distribution circuit with 2.5MW capacity (0.4 mile extension required to reach site, 6 month estimated completion)
Existing
Proposed
Duke Energy
Water:
8" line 55 PSI
Existing
Planned 12” line, completion by 2021/2022
City of Zephyrhills
Wastewater:
6” line (line upgrade possible approximately 6 months)
City of Zephyrhills
Telecommunications:
Fiber available
Frontier