Electric:
12.47kV 3-phase distribution circuit with 2.5MW capacity (0.4 mile extension required to reach site, 6 month estimated completion)
12.47kV 3-phase distribution circuit with 2.5MW capacity (0.4 mile extension required to reach site, 6 month estimated completion)

Existing

Proposed
Duke Energy
Duke Energy
Water:
8" line 55 PSI
8" line 55 PSI

Existing

Planned 12” line, completion by 2021/2022
City of Zephyrhills
City of Zephyrhills
Wastewater:
6” line (line upgrade possible approximately 6 months)
6” line (line upgrade possible approximately 6 months)

City of Zephyrhills
Telecommunications:
Fiber available
Fiber available

Frontier
Natural Gas:
4” main extension to site approximately 3 months
TECO Peoples Gas
4” main extension to site approximately 3 months
TECO Peoples Gas