![base art](/images/interface/map/north-tampa-base.jpg)
![Roads](/images/interface/map/north-tampa-roads-R1.png)
![Site Outline 111 acres](/images/interface/map/north-tampa-property-r2.png)
![Water](/images/interface/map/north-tampa-water.png)
![Wastewater](/images/interface/map/north-tampa-sewer.png)
![Rail](/images/interface/map/north-tampa-rail-R1.png)
![Electric](/images/interface/map/north-tampa-power.png)
![Telecommunications](/images/interface/map/north-tampa-telecomm.png)
![top layer](/images/interface/map/north-tampa-top.png)
Electric:
12.47kV 3-phase distribution circuit with 2.5MW capacity (0.4 mile extension required to reach site, 6 month estimated completion)
12.47kV 3-phase distribution circuit with 2.5MW capacity (0.4 mile extension required to reach site, 6 month estimated completion)
![power lines](/images/interface/map/line-red.png)
Existing
![proposed power lines](/images/interface/map/line-red-dotted.png)
Proposed
Duke Energy
Duke Energy
Water:
8" line 55 PSI
8" line 55 PSI
![water lines](/images/interface/map/line-blue.png)
Existing
![proposed water lines](/images/interface/map/line-blue-dotted.png)
Planned 12” line, completion by 2021/2022
City of Zephyrhills
City of Zephyrhills
Wastewater:
6” line (line upgrade possible approximately 6 months)
6” line (line upgrade possible approximately 6 months)
![wastewater lines](/images/interface/map/line-green.png)
City of Zephyrhills
Telecommunications:
Fiber available
Fiber available
![Telecommunication lines](/images/interface/map/line-orange.png)
Frontier
Natural Gas:
4” main extension to site approximately 3 months
TECO Peoples Gas
4” main extension to site approximately 3 months
TECO Peoples Gas
![flame icon](/images/interface/map/icon-flame.png)